Discover the epitome of performance with the Factory 15K 4500W Luxury Ultrasonic Welding Machine. Expertly crafted by the illustrious Dongguan Linjie Ultrasonic Mechanical & Electrical Equipment Co., Ltd., this masterpiece of modern technology represents the zenith of innovation. Featuring a sophisticated high-precision welding capability, it ensures unrivaled accuracy and exceptional quality in every use. Equipped with state-of-the-art functionalities like power-on detection for seamless, uninterrupted operations, and amplitude monitoring for comprehensive control and assurance throughout the welding process, this machine is designed to revolutionize your production line. Immerse yourself in the future of industrial excellence with this high-power, luxurious ultrasonic welding solution.
Equipment Features
- The robust single-column lifting mechanism offers effortless operation and outstanding load-bearing capability.
- Designed with an expansive work surface and stable mechanical attributes, ideal for versatile welding applications.
- Featuring linear ball guide rails for superior precision and extended durability.
- Durable imported horn for enhanced longevity.
- Machine power can be adjusted freely for optimal flexibility.
- Equipped with a Taiwan original transformer ceramic converter for stable and lasting performance.
- Four-point horizontal leveling screws facilitate swift and precise mold adjustments.
- The surface is treated with hot-dip varnishing for excellent corrosion resistance.
Equipment Technical Parameters
Model |
LJ-H Series |
Frequency |
20KHz |
15KHz |
Input Voltage |
AC SINGLE PHASE,220V 50/60Hz |
MAX Power |
2.2KW |
3.2KW |
2.8KW |
3.8KW |
5.0KW |
Horn Journey |
75MM |
80MM |
100MM |
Lifting Control |
Electric/Manual |
Working Time |
0.01-9.99S |
Pressure |
Pressure bound 1-7bar |
Dimension |
650*620*1840MM |
750*750*2020MM |
N.W |
150KG |
160KG |
180KG |
180KG |
195KG |







Q1.What is the Trade Term?
A1:Ex-work factory , FOB Guangzhou, FOB shenzhen
Q2. How long is the guarantee (period)?
A2:1 year quality warranty .
Q3.How many colors for selection ?
A3:More than 3 colors. We will provide you the color card , pls choose your favorite from it.
Q4.How long is our Production leading time?
A4:within 7-10 days upon receive deposit in normal season, and 10-15days in our busy time(August,September,October).
Q5.What is the Payment term?
A5:T/T or L/C at sight. 50% Deposit for start the production ,the balance before the shipment when goods are ready.
Q6.What is the packing details?
A6:Knock down Packing with the carton boxes ,and inside with the pear cotton for protection. Glass parts are packed with
wooden frame outsides to protect the items.
Q7. What support you will have to assemble this furniture?
A7: Inside each packing of the office table products ,we have put the exactly instruction book ,you can assemble the office table very easy .
Q8.What kind of documents we will provide to you?
A8:B/L,Commercial Invoice, Packing List,Certificate of Original. with these documents you or your borker can do the customs declaration at your side.
Q9. During shipping, if there is a damage to products, how do you get replacement?
A9: During shipping,our shipping angancy will try to ensure the safety of the goods.If there is a damage to products, they would be responsible for the damage .If it is not a very serious problems,we will help you and compensate you the damaged parts.
Q10. If there are any missing parts in our shipment, how long it takes for you to send?
A10: If there is some small missing components,we will DHL to you ASAP within one week.