Immerse yourself in the exceptional capabilities of the Factory 15K 4500W Luxury Ultrasonic Welding Machine. Crafted with precision by the esteemed Dongguan Linjie Ultrasonic Mechanical & Electrical Equipment Co., Ltd., this state-of-the-art device represents the zenith of technological advancement. Featuring a sophisticated high-precision welding mechanism, it ensures unrivaled accuracy and flawless quality in every task. Equipped with forward-thinking features like power-on detection for seamless, uninterrupted performance and amplitude monitoring for optimal control and assurance during welding, this machine is a transformative addition to any production line. Embrace the future of industrial excellence with this powerful, luxurious ultrasonic welding solution.
Equipment Features
- The robust single-column lifting body is ergonomically designed for easy operation and exceptional force-bearing capacity.
- Generous work surface with stable mechanical properties, ideal for versatile welding applications.
- High-precision linear ball guide rails offer superior precision and extended service life.
- Durable imported horn ensures long-lasting performance.
- Easily adjustable machine power to suit diverse operational needs.
- Features an original Taiwan transformer ceramic converter, providing stability and durability.
- Four-point horizontal leveling screws enable swift and effortless mold adjustments.
- Hot-dip varnished surface provides excellent corrosion resistance.
Equipment technical parameters
Model |
LJ-H Series |
Frequency |
20KHz |
15KHz |
Input Voltage |
AC SINGLE PHASE,220V 50/60Hz |
MAX Power |
2.2KW |
3.2KW |
2.8KW |
3.8KW |
5.0KW |
Horn Journey |
75MM |
80MM |
100MM |
Lifting Control |
Electric/Manual |
Working Time |
0.01-9.99S |
Pressure |
Pressure bound 1-7bar |
Dimension |
650*620*1840MM |
750*750*2020MM |
N.W |
150KG |
160KG |
180KG |
180KG |
195KG |







Q1.What is the Trade Term?
A1:Ex-work factory , FOB Guangzhou, FOB shenzhen
Q2. How long is the guarantee (period)?
A2:1 year quality warranty .
Q3.How many colors for selection ?
A3:More than 3 colors. We will provide you the color card , pls choose your favorite from it.
Q4.How long is our Production leading time?
A4:within 7-10 days upon receive deposit in normal season, and 10-15days in our busy time(August,September,October).
Q5.What is the Payment term?
A5:T/T or L/C at sight. 50% Deposit for start the production ,the balance before the shipment when goods are ready.
Q6.What is the packing details?
A6:Knock down Packing with the carton boxes ,and inside with the pear cotton for protection. Glass parts are packed with
wooden frame outsides to protect the items.
Q7. What support you will have to assemble this furniture?
A7: Inside each packing of the office table products ,we have put the exactly instruction book ,you can assemble the office table very easy .
Q8.What kind of documents we will provide to you?
A8:B/L,Commercial Invoice, Packing List,Certificate of Original. with these documents you or your borker can do the customs declaration at your side.
Q9. During shipping, if there is a damage to products, how do you get replacement?
A9: During shipping,our shipping angancy will try to ensure the safety of the goods.If there is a damage to products, they would be responsible for the damage .If it is not a very serious problems,we will help you and compensate you the damaged parts.
Q10. If there are any missing parts in our shipment, how long it takes for you to send?
A10: If there is some small missing components,we will DHL to you ASAP within one week.